On Monday last week Peter came with me to the allotment for the first time in ages. Our mission was to mark out exactly where all the different beds would be and with the aid of string and sticks/skewers we marked out 4 main beds with paths of approx 18" between each one. We marked out a bed for strawberries at the top of the plot, a herb bed next to where the leaf mould bin will be, a spinach bed which is in between my daughter's bed and the second compost bin site (these are at the bottom of the plot).
It doesn't sound like much but it took us the best part of 1½ hours to decide, measure and mark out all these different beds with paths in between. It was a job that needed two pairs of hands.
We also moved the compost bin from the top of the site (which in future years I hope to make into a small flower bed) to the bottom of the site and have now started a second compost pile.
I have also acquired a wheelbarrow now that I have loads of manure to transport to the different beds, and I have to say that I wish I had bought one earlier as it's much easier to take rubbish to the bonfire pile in a wheelbarrow rather than drag sacks down the hill and empty them there. You live and learn.
Wednesday, 5 March 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment